Skip to product information
1 of 5

MDMAustralian

2-in-1 Foldable Cat Tunnel & Donut Bed, Zip-Connect Design, White, 85 x 85 x 26 cm

Regular price $96.99 AUD
Regular price $102.00 AUD Sale price $96.99 AUD
Sale

or 4 interest-free payments of $24.25 AUD with Afterpay

Taxes included. Shipping calculated at checkout.
Quantity

Use code GET10 at checkout for 10% off your order

Code: GET10
Payment methods
  • American Express
  • Apple Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Product information

Full product details

V888-ELOSUNG49480V888-ELOSUNG49480

The Ultimate Playground for Interactive Play and Restful Naps

Satisfy your cat's natural instincts to hide, hunt, and sleep with our 2-in-1 Foldable Cat Tunnel Bed. This innovative modular system features a dual-zipper design that allows you to transform the setup in seconds. Keep it zipped as a secure circular doughnut for a cozy nesting spot, or unzip it to create an expansive S-curve tunnel for high-energy zoomies. The center features a soft, detachable 16x16-inch plush cushion that provides a comfortable retreat for naps. Designed with durable fabric and a 10-inch diameter tunnel, it accommodates cats of all sizes. The modular ends also allow you to connect multiple tunnels together, creating a massive feline labyrinth. When playtime is over, the lightweight tunnel folds down effortlessly and secures with integrated ties for space-saving storage.

Core Product Highlights

  • Versatile 2-in-1 Structure: Easily converts from a closed circular bed to an open S-shaped tunnel to keep your cat mentally and physically engaged.
  • Expandable Modular System: Features connectable ends, allowing you to link multiple sets together to build a customized cat park.
  • Oversized Play Area: A generous 10-inch tunnel diameter provides plenty of room for adult cats to run, hide, and peek through.
  • Comfortable Center Nest: Includes a detachable 16x16-inch padded mat that creates a secure and soft sleeping zone in the center of the ring.
  • Durable & Scratch-Resistant: Crafted from premium, high-density fabric built to withstand active claws and daily play.
  • Compact Travel Design: The spring-steel frame collapses in seconds and secures with toggles for easy storage in drawers or travel bags.

Product Specifications

Total Footprint 85 x 85 x 26 CM
Tunnel Diameter 25.4 CM (10 Inches)
Cushion Size 40.6 x 40.6 CM (16 x 16 Inches)
Net Weight 1kg

Returns, Refunds and Replacements

Products received faulty, damaged, or not as described are eligible for a return, refund, or replacement in accordance with local consumer laws. We are committed to ensuring all products meet the standards of quality and reliability expected by our customers.

Please note that for hygiene and safety reasons, pet play equipment cannot be returned for change of mind once it has been unboxed or used by a pet. Please ensure your play area has sufficient space (85x85cm) before ordering.

Delivery Timeframe

Delivery is approximately 5–12 business days (excluding weekends and public holidays).